Skip to the content
BestRustServers.xyz

48,032 players on 11,591 servers

Offline #15,948

MS Project | SOLO/DUO

80.221.91.195:28015 checked 11d ago

moddedcarbon

Players

Now0/25
Peak, 48 hours–
7-day average0
7-day peak–
No hourly history yet.

Hourly average and peak, UTC.

Server performance

This server has not answered a direct query in the last 48 hours.

48 hours: hourly readings. 30 to 90 days: one point a day, with the day's average and lowest fps, most entities and most memory, measured since 17 Sep. From asking the server directly; low fps and a climbing entity count mean lag.

Rank

daily · 1 is best
RankRank in region
15k10k15k20k20 Sep24 Sep28 Sep1 Oct5 Oct9 Oct

Top 70% of all ranked servers. Ranked on player hours over the last seven days.

Wipe schedule

too few wipes seen yet

Not enough wipes seen yet to tell when the next one is. Every server wipes at the monthly force wipe.

usual gap
8.5 days
between real wipes
wipe-day peak
1
players, last three wipes
crowd held
0%
else halves by day 1

The first 48 hours of its last wipes

Sat 26 SepThu 17 Sep
00.250.50.751+0h+9h+19h+28h+38h+47h

Players each hour, from the hour of the wipe. The latest peaked at 1, 0 hours in.

Wipes

newest first
WipedPeakCrowdLastedPlayers before
Sat 26 Sep, 09:07 UTC 17d ago 1 – running 1
Thu 17 Sep, 20:03 UTC 26d ago 1 halved by day 1 8.5 days 0

Peak: the most players in the first 48 hours. Crowd: whether every day of the wipe kept at least half that peak, or the day it fell below. A new world less than six hours after a wipe is a restart, not a wipe of its own.

Similar servers

the same kind of game, then region, group limit, rate and wipes
RETRO RUST #1 Х1000|NOLIMIT|LOOT++|KIT WIPE 13.10EU · groups of 16+ · weekly · 109 on average
27/245
МИНИ-КАРТА 2Х | STORM | FPS+ 10.10EU · groups of 8+ · weekly · 90 on average
92/100
404 RUST 2Х|ДЛЯ НОВИЧКОВ|РУССКИЙ 10.10EU · groups of 16+ · monthly · 85 on average
11/1000
404 RUST 2Х|ДЛЯ НОВИЧКОВ|РОССИЯ 08.10EU · groups of 16+ · monthly · 76 on average
4/1000
404 RUST 2Х|ДЛЯ НОВИЧКОВ|EU MAIN 11.10EU · groups of 16+ · monthly · 74 on average
12/700
SURVIVORS.GG | 2 x Vanilla | Monthlygroups of 30+ · monthly · 72 on average
19/200

Quick answers

from the figures on this page

Player Numbers

MS Project | SOLO/DUO ranking: what position does it hold?

Rank #15,948 over the last seven days in player hours: MS Project | SOLO/DUO, inside the top 70% of ranked servers.

How many players are on MS Project | SOLO/DUO?

The server MS Project | SOLO/DUO is currently offline; it was last seen 11 days 4 hours ago.

Tags & Lists

MS Project | SOLO/DUO tags: what do they indicate?

The game's server browser reads these tags from MS Project | SOLO/DUO: gmrust (Game mode): Standard survival gameplay; mp25 (Max players): Slot count is 25; ts8 (Group limit): The game default is 8 per team; v2633 (Protocol): Game protocol 2633; the same version is required to join; cs162929 (Build): Build 162929; ptrak (Networking): RakNet is the network layer in use; $r? (Region code): Region code missing; ^z (Modded): Plugins or settings alter the game, so it appears under Modded; ^y (Carbon): Uses Carbon for plugins. The top of this page also shows its current players, its queue and the time its world was made, all from the tags.

MS Project | SOLO/DUO in BestRustServers.xyz lists and filters: which ones?

These BestRustServers.xyz lists include MS Project | SOLO/DUO: Best modded Rust servers. These filters on the server list display it: Type: Modded; Server tag: Modded ^z and Carbon ^y; Group limit: 5 or more.

Server Details

MS Project | SOLO/DUO Rust version: which one?

On Linux, MS Project | SOLO/DUO runs Rust network protocol 2633 and build 162929. Steam updates your game automatically, but it needs to match the protocol to join.

How reliable is MS Project | SOLO/DUO and is it online?

Offline now for MS Project | SOLO/DUO, last seen 11 days 4 hours ago. It was up 0% of the time over the last 7 full days, 0 of 168 hours. On 13 September 2026, BestRustServers.xyz saw it for the first time.

MS Project | SOLO/DUO location: where is it?

There is no region published by MS Project | SOLO/DUO. BestRustServers.xyz shows the stated location of a server; the actual location of the machine is not looked up. 80.221.91.195:28015 is its address.

Settings & Map

Which map is used on MS Project | SOLO/DUO?

Generated by the game, the map on MS Project | SOLO/DUO is procedural, size 3,500, seed 789936933. View it on RustMaps from this page: identical size and seed produce an identical map.

What are the settings and rules for MS Project | SOLO/DUO?

No gather rate appears in the name of MS Project | SOLO/DUO. The default cap of 8 players per group is in force. It runs survival, gather, build, raid: the standard game. Raids and PvP are on. Listed as Modded in the browser: the game is changed by plugins or settings. Plugin count: Carbon. VAC protection is on.

Wipe Schedule

MS Project | SOLO/DUO wipe schedule: what does it show?

Too few wipes are on record for MS Project | SOLO/DUO to reveal its rhythm. The monthly force wipe applies to every Rust server, and the next is on Thursday 5 November at 19:00 UTC. The current world has been running since 17 days 15 hours.

On MS Project | SOLO/DUO, what occurs on wipe day?

An average peak of 1 players was drawn by its recent wipes. 0 hours after the latest wipe, the crowd hit its peak. Half the peak was held until the next wipe in 0% of its recent wipes. When it fell, the crowd dropped under half by day 1.

How to Join

What is the process to join MS Project | SOLO/DUO?

Enter client.connect 80.221.91.195:28015 in the console (F1 in Rust), or use Launch Rust on this page to open Steam and connect.

Server tags

what each one means

Published as mp25,ptrak,$r?,v2633,gmrust,cs162929,ts8,^z,^y

Game

gmrust
Game mode Standard survival gameplay.
mp25
Max players Slot count is 25.
ts8
Group limit The game default is 8 per team.
v2633
Protocol Game protocol 2633; the same version is required to join.
cs162929
Build Build 162929.
ptrak
Networking RakNet is the network layer in use.
$r?
Region code Region code missing.

Mods and access

^z
Modded Plugins or settings alter the game, so it appears under Modded.
^y
Carbon Uses Carbon for plugins.

Players now (cp), the queue (qp) and the wipe time (born) are in the tag string too; they change every few minutes and are shown at the top of the page. Flag meanings are Facepunch's.